- Дата: 10-06-2022, 22:52
Currently the mall is ongoing expansion with another annex being constructed about 23,000 m 2 and set to open in mid-2009 and the planned MRT station extension connecting the main mall is located at the 2nd floor. SM Prime President Mr.